lamella Clarifier

Automatic Total Suspended Solids Removal Technology

Process of Wastewater Treatment Plant

PROCESS OF WASTEWATER TREATMENT PLANT : Wastewater enters the treatment plant First it goes through a fine screen, next to aerated grit chamber, and then enters the primary clarifier. Sludge settled in the primary clarifier is sent to the fermenters and then to digesters. After the primary treatment, wastewater flows into (BNR) bioreactors. The activated sludge is separated in the following secondary clarifier. The clear effluent flows into Ultraviolet (UV), then to River. Settled activated sludge in the secondary clarifier is pumped back to BNR. Excess sludge is pumped into the dissolved air floatation (DAF) unit for thickening. Wastewater is collected in sanitary sewers (a complex network of underground pipes). Upon reaching the treatment plant, the wastewater flows through a series of treatment processes which remove the wastes from the...

BOD (Biochemical Oxygen Demad) Test in WasteWater

Introduction : General Discussion The biochemical oxygen demand (BOD) determination is an empirical test in which standardized laboratory procedures are used to determine the relative oxygen requirements of wastewaters, effluents, and polluted waters. The test has its widest application in measuring waste loadings to treatment plants and in evaluating the BOD-removal efficiency of such treatment systems. The test measures the molecular oxygen utilized during a specified incubation period for the biochemical degradation of organic material (carbonaceous demand) and the oxygen used to oxidize inorganic material such as sulfides and ferrous iron. It also may measure the amount of oxygen used to oxidize reduced forms of nitrogen (nitrogenous demand) unless their oxidation is prevented by an inhibitor. The seeding and dilution procedures provide an estimate of the BOD at pH 6.5 to 7.5. Measurements of oxygen consumed in a 5-d test period (5-d BOD or BOD5, 521 OB), oxygen con...